Hi All,
I am currently pretty new to Live cycle and have no idea about Java scripting, i have been using this site a lot for my forms and have used the FormCalc for expanding tables and so on but this one is proving difficult. I am currently designing a form that requires a calculation of one month prior to a user entered date by a Date/Time field. I have looked at multiple posts on how to do this but none have worked (they are using the Date2Num).
Is anyone able to enlighten me please?
I currently have:
Date/Time field Date Due
Date/Time field Planned Date of Review
I need Planned Date of Review to be calculated to be 30 days prior to Date Due. How do I go about doing this? Is it incorrect to use a Date/Time field as the field type for the calculation?
Cheers
Brad